11.jpg

Cycle route crossing entrance to industrial site.
Here the route crosses over this entrance to an industrial site. With the low volume of cycle traffic at the moment, this crossing is acceptable although not directly on the desire line. However if the volume of cycle traffic increases significantly in the future, this crossing will need to be reviewed. These dropped kerbs were already here, though, so very little money was spent on this section - a trade off between getting more length versus improving small details for minimal current benefit. As there is little traffic turning into this industrial site, this crossing is ok now.

Tags: